Two written frameless-shower quotes can describe different jobs, even for the same bathroom. One may include a door and fixed panel; another may assume a different layout, hardware set, or site condition. Before comparing totals, make clear what is supplied, installed, or left to you or another trade.
Ask each glass contractor the same questions and request written answers. This is not a price guide; it is a way to identify gaps before comparing proposals.
Start with the same layout and panel count
“Frameless enclosure” does not define a layout. Ask each quote to describe the configuration: inline, return, walk-in, or another arrangement. Confirm the panel count, which piece is the door, and whether a sketch or marked-up photo is included.
Record the door’s hinge side and swing, handle position, clear entry, and fixed-panel supports. Check whether each quote includes a return panel or header and how the glass meets walls, curb, tub, or ceiling. Note any assumptions about square corners or finished surfaces.
Identify the glass specification
Ask each contractor to state the glass type and thickness in writing; “clear glass” is not a full specification. Note whether it is clear, low-iron, tinted, patterned, or another appearance, and whether a requested coating is included, optional, or excluded. List notches, holes, angled cuts, and other fabrication details against the panel they affect.
The goal is to confirm both proposals describe the same glass and fabrication. If a detail is undecided, request separately identified alternatives rather than assuming the wording matches.
Compare the complete hardware set and finish
“Hardware included” leaves room for interpretation. Ask for the hinge style and count, handle or pull, clamps or brackets, any channel, seals, and door sweep to be listed. Then confirm the finish for each visible component. A finish name such as brushed nickel or matte black is useful, but the quote should also clarify whether all pieces are supplied in a matching finish or whether any item is a substitute.
If a particular brand, series, or model matters to you, ask for it to appear in the written scope. Check that the handle, hinges, and any support pieces work with the same layout and glass specification. Where the proposal allows substitutions, ask how an equivalent item will be approved before ordering.
Confirm finished surfaces and site readiness
Custom glass has to meet the surfaces that will actually remain in the bathroom. Ask what must be complete before final measurement: tile, grout, curb or shower base, flooring, and any ceiling or wall finish beside the enclosure. Clarify whether the quote assumes those surfaces are finished and stable, and what happens if they change after measuring.
Ask who checks the conditions that affect installation, including the position of wall backing for hardware, the finished opening, and the door’s path. If preparation or correction is needed, find out whether it belongs to the glass contractor, your renovator, or another trade. A proposal should distinguish glass installation from tile, waterproofing, framing, plumbing, or other work that is outside the glass scope.
Separate removal, disposal, and exclusions
For a replacement, ask whether the existing enclosure is being removed and taken away. “Installation” may refer only to the new glass. Confirm responsibility for removing old silicone, protecting nearby finishes, carrying materials through the home, collecting packaging, and leaving the work area clean.
Write down anything not included, especially tile or wall repairs, waterproofing, plumbing changes, substrate reinforcement, painting, and disposal. An explicit exclusion is easier to plan for than an assumption discovered after work starts. If an item is unclear, request a written clarification before accepting the proposal.
Account for strata access
For a condo or townhouse, the site plan may affect how materials and installers reach the bathroom. Check building requirements with your strata and ask each contractor what access information they need. Confirm who arranges elevator bookings, loading access, parking, protection for common areas, and any permitted work hours. Ask whether the proposal includes the time or materials needed for those arrangements, or assumes they are handled by someone else.
If approval documents or advance notice are required, identify who supplies each document and when the building needs it. Do not assume the same access conditions apply to every contractor; record any building-specific constraint alongside both quotes.
Use a side-by-side quote checklist
Copy this list into your notes or ask each contractor to answer it in the proposal. Mark each item “included,” “excluded,” or “needs clarification.”
| Scope item | Quote A | Quote B |
|---|---|---|
| Layout and panels | Door swing, panel count, sketch: ______ | Door swing, panel count, sketch: ______ |
| Glass | Type, thickness, finish, cut-outs: ______ | Type, thickness, finish, cut-outs: ______ |
| Hardware | Pieces, model or allowance, finish: ______ | Pieces, model or allowance, finish: ______ |
| Measurement and readiness | Required finished surfaces, assumptions: ______ | Required finished surfaces, assumptions: ______ |
| Removal and cleanup | Existing glass, disposal, cleanup: ______ | Existing glass, disposal, cleanup: ______ |
| Exclusions | Repairs, other trades, open questions: ______ | Repairs, other trades, open questions: ______ |
| Strata access | Bookings, protection, documents: ______ | Bookings, protection, documents: ______ |
| Written total and terms | Included items, taxes, changes: ______ | Included items, taxes, changes: ______ |
Resolve gaps before choosing
Send the same follow-up questions to each contractor and ask for any changed scope to be reflected in writing. Compare the revised documents, not a verbal summary or a line-item total separated from its assumptions. If one proposal remains less detailed, treat that as an unanswered question—not proof that the missing work is included.
For an overview of frameless shower layouts and glass options, visit our service page. When you are ready to discuss your own opening or share project details, contact WaveGlass.
Expert Consultation
Require engineering assessment for a structural glass project in British Columbia? Our glazing experts are ready to assist.
Contact Engineering